Warsaw Annopol Depot and Maintenance Facilities
Warsaw Annopol Depot and Maintenance Facilities
Location
Warsaw
Country
Poland
Client
Tramwaje Warszawskie
Contractor
ZUE S.A. & Yörük Yapi Insaat A.S.
Features / Capacity / Area
12 ha plot area / 11 buildings and workshops
Contract Date
2021 December
Project under construction in the ‘Design Build’ system (FIDIC YELLOW), the task is scheduled to take 28 months, with a planned completion date of April 2024. The Annopol Depot will be the fifth tramway depot in Warsaw.
The depot consists of a complex of cubature facilities for technical, technological and administrative area, specialist positions to keep the tramway rolling stock in full working order. Within the depot, 55 tracks with a total length of 14.25 km have been designed; 152 tram wagons, each 33 m long, will be garaged in the halls.
The project also includes the construction of an access road and the construction of an additional entrance to the depot area from the north-east side.
The construction of the depot is being carried out using BIM – Building Information Modelling methodology, the first investment of its kind in Poland.
Project scope carried out by Prota Polska:
- Internal road system with pedestrian routes and parking spaces on the Depot premises; reconstruction and extension of the road system of access streets to the Depot;
- Track layout in the Depot area, inside the halls and along the access road;
- Electrical installations: overhead medium- and low-voltage installations, cable networks, lighting of the area and access to the Depot;
- Sanitary installations: water supply, sewage and gas pipelines in the Depot area with hook-ups;
- Traction power at the Depot and along the access road;
- Structure: storage reservoir, grey water tanks, sand silo.