Tekkekoy 240 MW Combined Cycle Power Plant
Category Energy
Tekkekoy 240 MW Combined Cycle Power Plant
Location
Samsun, Tekkekoy
Country
Türkiye
Client
Cengiz Energy Inc.
Contractor
–
Features / Capacity / Area
240 MW
Contract Date
2008 January
The combined cycle power plant located in Samsun, in the north of Turkey, has a capacity of 240 Mw. The facility was built and operated by Cengiz Energy company in 2009.
Prota provided services in all branches within the scope of the facility project, in the concept, preliminary, final and detail stages. Within the scope of the project, Prota’s services include;
- Geotechnical and geological design
- Earthwork services
- Reinforced Concrete and Steel Design
- Architectural Design
- Electrical and ICT Engineering Design
- Mechanical Engineering Design
- Landscape and infrastructure Services
- Technical Consultancy Services
- BoQ and technical specification preparation services