Syrdarya 220 MW Combined Cycle Power Plant
Location
Syrdarya, Khavast
Country
Uzbekistan
Client
Cengiz Energy Inc.
Contractor
Cengiz Construction Inc.
Features / Capacity / Area
220 MW
Contract Date
2021 November
A gas piston thermal power plant with a capacity of 220 MW was built by the Turkish company Cengiz Enerji in the Khavast district. According to the ministry, construction and installation of equipment have already been completed at the facility.
Adjustment and commissioning works are currently underway, as well as preparations for connecting the power plant to the general power grid. The launch tests of the first gas-piston apparatus of the power plant were carried out.
The TPP will start supplying energy to the power grid approximately from 2025 October. It can produce 1.7 billion kWh per year.
Prota provided services in all branches within the scope of the facility project, in the concept, preliminary, final and detail stages. Within the scope of the project, Prota’s services include;
- Architectural Design
- Reinforced Concrete and Steel Design
- Electrical and ICT Engineering Design
- Mechanical Engineering Design
- Landscape and infrastructure Services
- BoQ and technical specification preparation services