Surat Metro, Phase-I

Surat Metro, Phase-I
Location
Surat, Gujarat
Country
India
Client
Gujarat Metro Rail Corporation (GMRC)
Contractor
Gulermak-SAM India JV
Features / Capacity / Area
3.50 km / 3 Underground Stations
Contract Date
2021 September
Surat city will have two corridors and a total of 38 stations – out of which 32 will be elevated and the remaining 6 will be underground.
The first corridor (Red Line) of the Surat metro project will connect Sarthana to Dream City and spread across 21 km – 5 km elevated segment and a 6.5 km underground section. The Red line will have 20 stations in total. The second corridor (Green Line) will connect Bhestan with Saroli and will have a total of 18 stations, all of which will be elevated.
Prota’s scope is limited to 3,50 km long and consists of 3 top-down underground stations. The design works of the line are commissioned by the GMRC (Gujarat Metro Rail Corporation).
Prota formed a JV together with Tumas A.S. in this project.
The services provided by Prota within the scope of the project are summarized below:
- Architecture, interior design and finishing works
- Structural Design
- Geotechnical Design Works