Nuh 40 MW Combined Cycle Power Plant
Category Energy
Nuh 40 MW Combined Cycle Power Plant
Location
Kocaeli, Hereke
Country
Türkiye
Client
Nuh Cement Inc.
Contractor
Cengiz Inc.
Features / Capacity / Area
40 MW
Contract Date
2005 February
Nuh Cement Power Plant, is located in Hereke district of Kocaeli. The facility, with a total capacity of 40 MW, was put into operation in 2005.
Prota provided services in all branches within the scope of the facility project, in the concept, preliminary, final and detail stages. Within the scope of the project, Prota’s services include;
- Geotechnical and geological design
- Reinforced Concrete and Steel Design
- Architectural Design
- Electrical Engineering Design
- Mechanical Engineering Design
- Landscape and infrastructure Services
- BoQ and technical specification preparation services