Nuh 40 MW Combined Cycle Power Plant

Location
Kocaeli, Hereke


Country
Türkiye


Client
Nuh Cement Inc.


Contractor
Cengiz Inc.


Features / Capacity / Area
40 MW


Contract Date
2005 February

Nuh Cement Power Plant, is located in Hereke district of Kocaeli. The facility, with a total capacity of 40 MW, was put into operation in 2005.

 

Prota provided services in all branches within the scope of the facility project, in the concept, preliminary, final and detail stages. Within the scope of the project, Prota’s services include;

  • Geotechnical and geological design
  • Reinforced Concrete and Steel Design
  • Architectural Design
  • Electrical Engineering Design
  • Mechanical Engineering Design
  • Landscape and infrastructure Services
  • BoQ and technical specification preparation services

 