Nordhalt Stuttgart Railway Project

Location
Stuttgart


Country
Germany


Client
Ministry of Transport Baden-Württemberg


Contractor


Features / Capacity / Area
220 m / 1 platform


Contract Date
2022 March

Stuttgart Nordhalt Metro line is 220 meters long and consists of 1 platform. The design works of the line, commissioned by the Stuttgart Ministry of Transportation, are ongoing. Prota has undertaken the preparation of LPH 1-4 projects for this line.

 

The planned capacity of the line is calculated as 1.700 passengers per day.

The construction includes following components:

  • 220 m Platform
  • Stairway to Brünner Steg (rope bridge)
  • Elevator to Brünner Steg (rope bridge)
  • Road connection (stairway, ramp) to Mia-Seeger-Straße

 

The services provided by Prota within the scope of the project are summarized below:

  • Architecture, interior design and finishing works
  • Mechanical system, infrastructure, installation and HVAC
  • Electrical, ICT and electronic systems
  • Landscaping, traffic, landscape and urban design