Jizzakh 550 MW Combined Cycle Power Plant
Category Energy
Jizzakh 550 MW Combined Cycle Power Plant
Location
Jizzakh
Country
Uzbekistan
Client
Cengiz Energy Inc.
Contractor
Cenergo LLC
Features / Capacity / Area
550 MW
Contract Date
2023 November
The 550 MW capacity combined cycle power plant located in Jizzakh region of Uzbekistan. The project, which is expected to be operational by 2025, will be undertaken by Turkish company Cengiz Enerji Inc. and design company Cenergo.
Prota provided services in all branches within the scope of the facility project, in the concept, preliminary, final and detail stages. Within the scope of the project, Prota’s services include;
- Architectural Design
- Reinforced Concrete and Steel Design
- Electrical and ICT Engineering Design
- Mechanical Engineering Design
- Landscape and infrastructure Services
- Technical Consultancy Services
- BoQ and technical specification preparation services