HRSG Kocaeli CCPP
HRSG Kocaeli CCPP
Location
Kocaeli, Gebze
Country
Turkey
Client
ANSALDO ENERGIA s.p.a
Contractor
EKON Industry Construction and Trade Inc.
Features / Capacity / Area
850 MW
Contract Date
2011 March
The main contractor and investor of the power plant is Italian company ANSALDO ENERGIA s.p.a. (AEN) and EKON Industry Construction and Trade Inc. is local contractor of AEN for the scope of complete detail engineering, manufacturing, civil and structural steel works, supply and erection works of the plant.
The project covers 2 units of 94.3A gas turbines (each 294 MW), and generators set, 2 units of heat recovery steam generators with stack, 1 unit of steam turbine with a capacity of 280 MW. The foundations of Gas Turbine and Steam Turbine Structures are in reinforced concrete type where the superstructures are designed in steel structure type.
Prota provided services for steel structural engineering and BoQ and technical specification preparation in the permit, preliminary, final and detail stages.