GAMA İc Anadolu CCPP
GAMA İc Anadolu CCPP
Location
Kirikkale
Country
Türkiye
Client
Ic Anadolu Natural Gas Electricity Production and Trade Inc.
Contractor
GAMA Inc.
Features / Capacity / Area
850 MW
Contract Date
2012 December
Construction of a Combined Cycle Power Plant (CCPP) in Kirikkale, Turkey with a total power output of 853 MW is realized for Ic Anadolu Natural Gas Electricity Production and Trade Inc. is implemented on a turnkey basis.
GE STAG 209 9FB MS, is used in the power plant which is designed for 30 years lifespan. GAMA Power Systems and GE Energy as consortium undertakes the responsibility of supply and erection of 2 GE 9FB gas turbines, 1 GE steam turbines, 2 Doosan HRSG’s, Air Cooled Condenser, 380 kV HV switchyard as well as all balance of plant equipment under an EPC contract. Within this scope, basic & detail design of the power plant, civil works, structural, electro mechanical works, erection, installation of electrical, instrumentation & control systems, test and commissioning, start-up works and training of the Employer’s personnel performed in the course of project.
Prota provided services in all branches within the scope of the facility project, in the concept, preliminary, final and detail stages.
Within the scope of the project, Prota’s services include;
- Architectural Design
- Reinforced Concrete and Steel Design
- Electrical and ICT Engineering Design
- Mechanical Engineering Design
- Landscape and infrastructure Services
- Technical Consultancy Services
- BoQ and technical specification preparation services