Cengiz-Samsun 610 Mw CCPP
Category Energy
Cengiz-Samsun 610 Mw CCPP
Location
Samsun
Country
Turkey
Client
Cengiz Energy Inc.
Contractor
Cengiz Constr. Inc
Features / Capacity / Area
610 MW
Contract Date
2016 January
The combined cycle power plant located in Samsun, in the north of Turkey, has a capacity of 610 MW. Built and operated by Cengiz Energy company, the facility commenced operations in 2017. This plant contributes significantly to the region’s electricity generation capacity and represents a key investment in Turkey’s energy infrastructure.
Prota provided services in all branches within the scope of the facility project, in the concept, preliminary, final and detail stages. Within the scope of the project, Prota’s services include;
- Geotechnical and geological design
- Earthwork services
- Reinforced Concrete and Steel Design
- Architectural Design
- Electrical and ICT Engineering Design
- Mechanical Engineering Design
- Landscape and infrastructure Services
- Technical Consultancy Services
- BoQ and technical specification preparation services