Bursa T2 Tram Line

Location
Bursa


Country
Türkiye


Client
Bursa Metropolitan Municipality


Contractor
Ultra Tech. Inc


Features / Capacity / Area
8.30 Km / 11 Stations / Depot and Maintenance Facility


Contract Date
2016 March

The line has 11 stations and a depot/maintenance area.

 

Concept, preliminary and detail projects and tender documents of the tram line have been prepared. The work carried out within the scope of work is as follows;

  • P1- 11 Stations’ General layout, architectural, structural, electrical and mechanical installation, landscaping projects.
  • P2- Depot and Maintenance Facility, water tank (fire and pump building); general layout, architecture, static, electrical and mechanical installation, landscape projects.
  • P3- Traction power transformer buildings; general layout, architecture, structural, electrical and mechanical installation, landscape projects.
  • P4, 5, 6 – Bridge 1, Bridge 2, Bridge 4; general layout and structural projects.

Additionally, preparation of design handbooks, transportation and track study report, alignment, rail and track design, earthquake survey report, geological site studies and reports, drainage and infrastructure design, landscape and urban renewal works were done in the scope of the project.