Bursa T2 Tram Line
Category Rail and Metros
Bursa T2 Tram Line
Location
Bursa
Country
Türkiye
Client
Bursa Metropolitan Municipality
Contractor
Ultra Tech. Inc
Features / Capacity / Area
8.30 Km / 11 Stations / Depot and Maintenance Facility
Contract Date
2016 March
The line has 11 stations and a depot/maintenance area.
Concept, preliminary and detail projects and tender documents of the tram line have been prepared. The work carried out within the scope of work is as follows;
- P1- 11 Stations’ General layout, architectural, structural, electrical and mechanical installation, landscaping projects.
- P2- Depot and Maintenance Facility, water tank (fire and pump building); general layout, architecture, static, electrical and mechanical installation, landscape projects.
- P3- Traction power transformer buildings; general layout, architecture, structural, electrical and mechanical installation, landscape projects.
- P4, 5, 6 – Bridge 1, Bridge 2, Bridge 4; general layout and structural projects.
Additionally, preparation of design handbooks, transportation and track study report, alignment, rail and track design, earthquake survey report, geological site studies and reports, drainage and infrastructure design, landscape and urban renewal works were done in the scope of the project.