Eyup - Rami - Yesilpinar Cable Car Line

Location
Istanbul


Country
Türkiye


Client
Istanbul Metropolitan Municipality


Contractor


Features / Capacity / Area
2,5 km / 3 Stations


Contract Date
2015 February

For the 2.5 km cable car project, a comprehensive range of studies and designs were conducted. These included the preparation of transportation and track studies, as well as the development of station preliminary architectural, electrical and mechanical (E&M), infrastructure, drainage, retaining wall, and structural designs. Additionally, the project involved the implementation of a control and communication system, geotechnical assessments, and financial and economic feasibility studies. This holistic approach ensured that all aspects of the cable car project were carefully considered and planned for, from its physical infrastructure to its operational and economic viability.