Adana Tufanbeyli Thermal Power Plant

Location
Adana, Tufanbeyli


Country
Türkiye


Client
EnerjiSA


Contractor
SK Construction & Engineering Ltd.


Features / Capacity / Area
450 MW


Contract Date
2011 December

In 2006, Enerjisa Enerji Uretim, a partnership between Sabanci Holding and E. ON, secured the rights to construct a three-unit, 450-MW coal-fired power plant in the Tufanbeyli district of Adana province. Prota was the lead designer for the original plan to build the plant. However, due to the onset of the economic crisis, the project was delayed for three years.

 

In 2010, SK Construction & Engineering and ITOCHU Corporation were assigned the construction contract for the power plant. Construction was successfully completed in 2016, marking a significant milestone in the region’s energy infrastructure development.

 

Covering around 1600 hectares, the power plant is the country’s largest privately owned, lignite-fired plant. Within the scope of the project Prota’s services include;

  • Reinforced Concrete and Steel Design
  • Architectural Design
  • Electrical Engineering Design
  • Mechanical Engineering Design
  • Fire Safety Engineering and Control System Design
  • Landscape Design Services
  • Infrastructure System Design
  • Preparation of Cost Estimates, Bills of Quantities and Tender Documents
  • Technical advisory